23 chillers on 5 skids supplying 500kW comfort cooling.
![Holmewood House School](http://www.roburheatpumps.co.uk/wp-content/uploads/2017/07/Holmewood-House-School-300x214.jpg)
Holmewood House School, Tunbridge Wells
Claire Kerr2018-12-12T22:48:32+00:00Two reversible heat pumps and a boiler delivering underfloor 117kW heating throughout and 37kW of summer cooling to the school hall via an air handling unit.
![National Physical Laboratory](http://www.roburheatpumps.co.uk/wp-content/uploads/2017/07/National-Physical-Laboratory-300x214.jpg)
National Physical Laboratory, Teddington
Claire Kerr2018-12-12T22:48:32+00:00A skid comprising a chiller, a reversible heat pump and a boiler, to provide heating and cooling to an air handling unit in Building 38.
Embassy Gardens, Nine Elms, London
Claire Kerr2018-12-12T22:48:32+00:0085 chillers on three buildings of luxury homes, 2 MW comfort cooling.
![The apartments of the 2MW project, in Haarlem, Netherlands](http://www.roburheatpumps.co.uk/wp-content/uploads/2014/01/2MW-Haarlem-300x214.png)
2 MegaWatt-project, Haarlem, Netherlands
Claire Kerr2018-12-12T22:48:32+00:00Robur GAHPs as part of a sustainable heating, cooling and hot water system for 382 social housing apartments in The Netherlands.